Field Service Management Software That Actually Runs Your Operation

Field Ascend is cloud-based field service software that combines AI automation, scheduling, work order management, and a native mobile app into one platform. It replaces the patchwork of spreadsheets, shared calendars, and disconnected tools that most service businesses still rely on. Built for HVAC, plumbing, electrical, elevator, and 30+ trades — this is FSM software designed to handle real operational complexity, not just basic dispatching.

Start Your Free Trial
100+
Features
20
Feature Categories
30+
Industries Served
5
Accounting Integrations

AI & Automation

Field Ascend is AI field service software that does real work — generating quotes, building dashboards, analyzing purchase orders, and writing reports from plain-English questions. Not chatbot gimmicks, but automation that saves hours every week.

📊

AI Dashboard Builder

Build custom dashboards in minutes using plain English. Ask for "overdue invoices this month" or "technician utilization by week" and watch the dashboard create itself. 50+ tile types, real-time data, drag-and-drop layout.

  • Natural language dashboard creation
  • Role-based views for managers, dispatchers, owners
  • Real-time metrics with color-coded alerts

AI Estimating

Draft professional estimates in seconds. Upload a customer request, or create an estimate from a completed work order, PM defect, or structured task list. Perfect for HVAC, electrical, plumbing, and specialty trades.

  • Uses relevant job and pricing context
  • Upload emails or documents for estimate drafts
  • Fully editable results with AI speed
📜

AI Certificate Builder

Generate compliance certificates with AI assistance. Equipment inspection certificates, electrical test reports, and custom compliance documents pre-filled from equipment data and inspection history.

📈

AI Report Builder

Ask questions in plain English and get formatted PDF or Excel reports. "Show me all incomplete jobs for ABC Company" generates a professional report instantly. No report builder training needed.

📄

AI Purchase Order Analysis

Upload purchase orders from customers and AI extracts line items, matches them to your quotes, and creates jobs automatically. Batch upload multiple POs at once. Eliminates manual data entry.

🤖

Auto-Scheduling

AI-powered job assignment based on technician skills, location, availability, and job priority. Suggests the best technician for each job. You confirm with one click.

🔌

AI Connector for Claude

Connect Field Ascend to Claude and ask plain-English questions about jobs, customers, equipment, PM contracts, certificates, and service history. Read-only tools and OAuth security keep the connection controlled.

📤

Magic Importer

Upload a spreadsheet and let AI help identify whether it contains customers, sites, contacts, equipment, jobs, inventory, or tools. Validation happens before import so migration work stays controlled.

🧠

AI PM Builder

Use AI assistance to turn equipment types, service routines, and inspection scopes into structured preventive maintenance checksheets that technicians can complete in the mobile app.

AI Dashboard Builder with customizable tiles and real-time field service metrics

AI Dashboard Builder — create custom dashboards from plain-English questions

Scheduling & Dispatch

Field service scheduling software that gives dispatchers a visual command center. Drag-and-drop planner boards, map-based job allocation, geofenced technician territories, and smart matching rules that suggest the right person for every job.

📋

Visual Planner Board

Drag-and-drop field service scheduling software with day, week, and month views. See technician availability, job durations, and travel gaps at a glance. Resize jobs for duration changes, spot conflicts instantly.

  • Day, week, and month calendar views
  • Drag jobs between technicians
  • Unscheduled jobs queue with quick assign
🗺️

Map-Based Job Allocation

See all jobs on a map and allocate intelligently. Use the lasso tool to select multiple jobs at once and assign to a technician in bulk. Filter by ZIP code, status, or customer.

  • Lasso selection for bulk assignment
  • Route visualization between jobs
  • Filter by area, status, or job type
📍

GPS Technician Tracking

See exactly where your technicians are on an interactive map. View status indicators (traveling, on-site, available), speed, and heading. Know who's closest to an emergency callout.

🎯

Technician Territory Geofencing

Create technician territories using polygon drawing, radius zones (10-100+ miles), or travel time isochrones. Auto-assign jobs by location, alert dispatchers when assigning outside territories, or enforce strict boundaries.

🧩

Smart Planner Matching

Visual skill badges show technician qualifications at a glance. Territory indicators highlight when technicians are in or out of zone. Configurable rules for skills, territory, availability, and distance priority.

🛣️

Route Optimization

Optimize daily routes to minimize drive time and maximize billable hours. See suggested route order, estimated travel times, and total mileage before the day starts.

🗓️

Shift & Crew Planning

Plan availability, shifts, working patterns, and coverage alongside the scheduler. Dispatchers can avoid assigning work into time off, absences, or unavailable periods.

🔗

Google & Outlook Calendar Sync

Subscribe the dispatch board in the calendar your team already uses. Publish a secure feed to Google Calendar, Outlook, or Apple Calendar — a master company calendar or one per technician. Work orders and planner events both appear, read-only, with time zones handled automatically.

Visual planner board with technician schedules and drag-and-drop job scheduling

Visual Planner Board — drag-and-drop scheduling with day, week, and month views

Map showing technician territory zones with geofencing and isochrone boundaries

Technician Territory Geofencing — polygon, radius, and travel-time zones

Work Orders & Jobs

Job management software and work order management software that track every job from creation to completion. Table view, Kanban board, or planner — pick the view that fits how your team works, and never lose visibility into what's open, what's blocked, and what needs attention.

📝

Work Order Management

Create, assign, track, and complete work orders with real-time updates. Full lifecycle management with custom statuses, categories, and priorities. Table view, list view, or Kanban board.

  • Custom status workflows per job type
  • Bulk actions for efficiency
  • Full job history and audit trail
📊

Kanban Board View

Visualize work orders in a Kanban board with drag-and-drop between status columns. See all jobs by stage, spot bottlenecks, and move work forward without opening individual records.

Job Task Management

Break work orders into tickable tasks with their own scope, completion notes, and audit trail. Quote tasks carry through automatically, technicians tap to complete on mobile with quick phrases, invoice mirrors the same task structure end to end.

  • Quote → work order task carry-through
  • Tap-to-complete with quick phrase chips
  • Force-completion + reopen audit trail

Job Templates & Presets

Create jobs in one click with reusable templates. Pre-fill titles, categories, notes, materials, technicians, and compliance checks. Build once, use everywhere across your team.

📎

Job Documents & Photos

Attach documents, photos, and files to any job. Before and after photos, signed documents, technical manuals, customer communications. Batch download for customer handover.

✍️

Digital Signatures

Capture customer and technician signatures on any device. Signatures stored securely and appear on job completion PDFs. Configurable signature requirements per job type.

🔄

Lifecycle Flowchart

Visual flowchart showing how quotes, jobs, invoices, and purchase orders connect. Click any node to navigate instantly. Full audit trail for compliance and customer queries.

Action Lists & Forced Completion

Create required job action lists and completion gates. Force photos, work done notes, equipment selection, PM checks, compliance forms, refrigerant logs, signatures, or custom tasks before closure.

📊

Quote Kanban & Workflow Statuses

Manage quote pipelines visually with configurable statuses, color-coded workflow columns, and follow-up views. Keep draft, sent, accepted, declined, and review estimates moving.

Kanban board with work orders organized by status columns and drag-and-drop

Kanban Board — drag work orders between status columns

Customer Management

A built-in CRM purpose-built for service businesses. Customer profiles, multi-contact management, communication logs, a self-service portal, and a ticketing system that captures requests from phone, email, or web and converts them into jobs.

👥

Customer Database & CRM

Complete customer profiles with contact details, billing information, service history, and communication logs. Search, filter, and segment your customer base. Link customers to sites, equipment, and contracts.

📇

Contact Management

Multiple contacts per customer with roles, phone numbers, and email addresses. Set primary contacts for invoicing, site contacts for access, and technical contacts for equipment questions.

🌐

Customer Portal

Give customers 24/7 access to their service history. View jobs, approve quotes, download invoices, submit support requests. Branded with your logo. Reduces phone calls and improves customer satisfaction.

🎫

Customer Ticketing System

Capture inbound requests from phone, email, website, or portal. Custom ticket statuses, priorities, and categories. One-click conversion from ticket to job or quote with full data carry-across.

📧

Communication History

Full log of every email, quote, invoice, and job sent to each customer. See what was communicated and when. Email open tracking available for quotes and invoices.

🗺️

Customer Estate Map

Map all customer sites and see equipment condition by location. Status-segmented markers help account managers and customers understand risk across large estates or multi-site contracts.

📊

Customer Reports

Publish selected saved reports to the customer portal so clients can run service, equipment, invoice, or compliance reports and export CSV or Excel without emailing the office.

Customer portal dashboard showing jobs, invoices, quotes and service history

Customer Portal — self-service access to jobs, quotes, invoices, and service history

Sites & Equipment

Equipment tracking and multi-site management for commercial service operations. Maintain a complete asset registry with service history, log defects with photos, and organize large sites into zones so technicians know exactly where to go.

🏢

Multi-Site Management

Manage customers with multiple locations. Each site has its own address, contacts, equipment, access instructions, and service history. Perfect for facility management and commercial service contracts.

📍

Site Areas & Zones

Organize large sites into areas, floors, or zones. Assign equipment to specific areas. Technicians know exactly where to go on arrival. Building management made simple.

🏭

Equipment Registry

Complete asset tracking with serial numbers, makes, models, installation dates, warranty status, and custom fields. Full service history per asset. Know exactly what equipment you're maintaining.

⚠️

PM Defect Tracking & Remediation

Log deficiencies on PM inspections with custom severity tiers, bulk-quote remedial works from the work order page, and auto-resolve defects when the linked task completes. Full audit trail from inspection to resolution.

📱

QR Code Lookup

Assign QR codes to equipment and scan from the mobile app. Instant access to equipment details, service history, and open jobs. Perfect for technicians in the field.

🧭

Floorplans & Control Room Views

Upload site floorplans, pin equipment to exact positions, and view asset condition visually. Technicians and customers can understand where equipment lives across large facilities.

Equipment registry showing assets with types, serial numbers and service history

Equipment Registry — full asset tracking with service history and custom fields

Quoting & Estimates

Quoting and estimating tools that shorten the gap between customer request and signed proposal. Build quotes with labor and material breakdowns, send branded PDFs, and let customers accept directly from the email — no login required.

🧱

Structured Quote Builder

Build itemized quotes with sections and tasks instead of a flat line list. Group tasks by section or equipment, per-task labor calculator with rate bands, materials picker from your stock catalog. Customer PDF mirrors the structure end to end.

  • Sections + tasks with per-section subtotals
  • Per-task labor calculator with rate bands
  • Materials picker from stock catalog
📝

Quote Builder

Build quotes with labor breakdown, materials costing, and miscellaneous items. Apply markups, discounts, and taxes. Preview exactly what the customer will see before sending.

AI-Powered Estimating

Draft estimates in seconds using AI. Upload customer requests, emails, or specifications, or use work order and PM defect context. Per-task and bulk AI assist on the structured builder. Edit and send in minutes instead of hours.

Online Quote Acceptance

Customers accept, decline, or provide feedback directly from the email. No portal login required. One click to accept, instant notification to your team, automatic job creation option.

📊

Quote Analytics

Track quote performance with acceptance rates, average response times, and win/loss analysis. See which quote types perform best and optimize your pricing strategy.

📄

Quote Templates

Design professional quote PDFs with your branding. Drag-and-drop template builder with merge tags for dynamic content. Multiple templates for different service types.

Preventive Maintenance

Preventive maintenance scheduling that automates recurring service visits. Create PM contracts, auto-generate jobs when visits are due, run equipment-specific checksheets from the mobile app, and batch-invoice completed maintenance work — all from one system. Explore the full preventive maintenance software workflow or see how Field Ascend works as CMMS software.

🛠️

Preventive Maintenance Software

Run recurring service visits, asset-linked schedules, mobile checksheets, customer-ready reports, and invoice handoff from one contractor-focused PM workflow.

  • Recurring schedules and work orders
  • Mobile maintenance checksheets
  • Completed visits ready for billing
🔧

PM Schedule Management

Create recurring maintenance schedules with custom frequencies (weekly, monthly, quarterly, annual). Auto-generate jobs when visits are due. Link schedules to equipment for complete tracking.

  • Flexible scheduling frequencies
  • Auto-job creation when due
  • Equipment-specific schedules
📋

PM Contracts

Track service contracts with contract values, billing cycles, and renewal dates. Link multiple schedules to a single contract. Invoice contract visits automatically or in batches.

Maintenance Checksheets

Custom inspection checklists per equipment type. Technicians complete checksheets in the mobile app with pass/fail items, readings, and photos. Auto-generate defects from failed items.

💳

PM Invoice Queue

View all completed PM visits ready for invoicing in one queue. Select multiple jobs, batch generate invoices, and send to customers or sync to accounting in one click.

📊

Schedule Health Dashboard

At-a-glance view of PM compliance. See overdue visits, upcoming schedules, and completion rates. Catch missed maintenance before it becomes a customer complaint.

🔬

Tool Tracking & Calibration

Track your contractor-owned tools and test instruments — serial numbers, calibration due dates, OSHA-ready inspection records, and custody chain across warehouse, truck, and technician. Dispatch blocks non-compliant tools automatically.

  • Calibration & inspection management
  • Tool custody chain & audit trail
  • Dispatch blocks overdue tools
📓

Log Cards

Create configurable site or equipment log cards for readings, checks, and recurring inspection records. Technicians complete entries in the job workflow and the office keeps an audit-ready history.

Certificates & Compliance

Compliance tools built for regulated trades. Generate inspection certificates, enforce mandatory checklists before job closure, track EPA 608 refrigerant data for HVAC, and maintain a full audit trail that's ready when inspectors ask.

📜

Certificate Builder

Generate equipment inspection certificates, electrical test reports, and custom compliance documents. AI pre-fills based on equipment data. Export as branded PDFs ready for customer delivery.

❄️

EPA 608 Refrigerant Tracking

For HVAC contractors: Per-equipment refrigerant logging, automatic CO2e calculations, running charge tracking, and leak check scheduling. Force rules ensure technicians log refrigerant data before completing jobs.

  • Per-equipment refrigerant logs
  • Automatic calculations and thresholds
  • Leak check scheduling

Compliance Checklists

Mandatory checklists that technicians must complete before closing jobs. Configurable per job type. Enforce safety checks, customer sign-offs, and regulatory requirements.

⚠️

RAMS / Safety Documentation

Risk Assessment and Method Statement management. Assign RAMS to jobs or sites. Technicians acknowledge safety documents in the mobile app before starting work, with digital signatures for compliance evidence.

🔌

Electrical Safety Testing

Track electrical inspections, appliance testing, and safety compliance. Custom test forms, automatic certificate generation, and full audit history per asset.

🗄️

Vault — Document Management

A secure, shared document library for your whole team. Store O&M manuals, certificates, SDS, install guides, and company policies in one place — with folder-level access control and instant access on the technician mobile app.

  • Company-wide file storage
  • Folder permissions by team
  • View & download in the field

Invoicing & Finance

Invoicing that flows directly from completed work orders. Generate invoices with pre-populated labor, materials, and expenses — then send, track payments, and sync to your accounting system without re-keying data.

💳

Invoice Generation

Create invoices directly from completed jobs with labor, materials, and expenses pre-populated. Customizable invoice templates, automatic tax calculations, and payment terms.

📧

Email Invoices

Send professional invoice PDFs directly to customers. Track email opens and link clicks. Automated payment reminders for overdue invoices.

💰

Payment Tracking

Track invoice status from sent to paid. Record partial payments, payment dates, and payment methods. See aging reports and chase overdue invoices.

📄

Credit Notes

Generate credit notes linked to original invoices. Full audit trail for refunds and adjustments. Sync credit notes to your accounting system automatically.

📊

Customer Statements

Generate customer statements showing all invoices, payments, and outstanding balances. Email statements directly to customers for payment collection.

🧾

Expense Tracking

Track business expenses, link them to jobs, and upload receipt photos. Convert paid purchase orders to expenses with one click. Real-time cashflow dashboard shows money in vs money out.

🔁

Recurring Invoices

Automate repeat billing for service contracts, retainers, and recurring charges. Generate invoices on schedule and keep recurring revenue connected to customers and accounting workflows.

Credit Limits & Auto-Hold

Set company defaults or customer-specific credit limits. Field Ascend can automatically place customers on hold when outstanding balances exceed their limit, reducing risky new work.

Mobile App for Technicians

A field service management app that works in basements, tunnels, and rural dead zones. Everything your technicians need — job details, planner visibility, maps, quotes, messaging, signatures, photos, timesheets, and materials — in one app that works with or without cell signal.

📱

Native Mobile App

iOS and Android app designed for field technicians. Access job details, update work done, collect signatures, take photos, and log time. Everything your team needs in their pocket.

  • iOS and Android native apps
  • Fast, responsive interface
  • Works on phones and tablets
📴

True Offline Capability

Works in basements, tunnels, and dead zones. Job details, photos, signatures, and timesheets are stored locally and sync automatically when connection returns. No data loss, no waiting.

📋

Complete Job Details

Every job detail at your technician's fingertips. Work done notes, materials used, labor times, equipment serviced, customer contacts, and site information. Update in real-time or offline.

🏠

Smart Job Dashboard

Start the day with the right jobs front and center. Technicians see open work, key priorities, quick filters, and personal tiles in one home view. The app keeps next actions obvious without digging through multiple screens.

🗓️

Planner & Calendar View

Give technicians a clear view of planned work by date. See assigned jobs, upcoming visits, and schedule changes in calendar-style views so the day is easier to organize in the field.

🗺️

Map-Enabled Field Work

Use in-app maps for location-aware working, job context, and route awareness. Technicians can see where work is, understand travel context, and move between jobs with better visibility during the day.

📸

Photo Capture

Take before and after photos, document defects, and capture equipment details. Photos attach to jobs automatically and sync to the office. Visual proof of work completed.

📍

GPS Job Validation

Verify technician location when clocking job times. GPS coordinates validate that time entries match actual job sites. Optional setting for businesses that need location verification.

🔔

Push Notifications

Real-time alerts for new job assignments, schedule changes, and urgent callouts. Return journey reminders ensure technicians log travel time. Configurable per-user preferences.

💬

In-App Messaging

Communicate without leaving the platform. Technicians can stay aligned with office teams and keep job conversations connected to the wider workflow instead of relying on separate messaging tools.

📝

Mobile Quote Access

Give technicians visibility of quote-related workflows on mobile. Review quote context in the field, keep work aligned to what was priced, and reduce back-and-forth when customers ask what has been proposed.

⏱️

In-App Timesheets

Time visibility stays inside the same app your technicians already use. Review captured travel and on-site time, keep daily records accurate, and avoid switching to separate tools just to manage timesheets.

🛡️

Lone Worker Safety

Protect technicians working alone with built-in check-ins, panic alerts, and escalation workflows. Live safety dashboard shows worker status. Configurable check-in intervals and emergency contacts.

🛰️

Realtime Timing Mode

Technicians can start travel, arrive on site, travel home, and end the day from the app. Timing records sync back for pricing, timesheets, GPS audit, and job history.

🏷️

Truck Stock Picking

Technicians can add materials from assigned truck or warehouse stock, linking parts to jobs and equipment while keeping inventory usage visible to the office.

🎙️

Voice Dictation & Quick Phrases

Capture work completed notes faster with voice dictation and reusable quick phrases. Standardize technician notes without making mobile data entry painful on site.

Field service mobile app showing GPS map with technician location and nearby job sites Mobile app job detail screen showing work done, materials, and customer information Field service app working offline with local sync status indicator

Left to right: GPS map view, job detail, and offline sync — all from the native mobile app

Technician Management

Technician profiles, certification tracking, Gantt-style timesheets, and GPS audit — in one place. Know who's qualified for what, verify time entries against actual locations, and export approved hours straight to payroll.

👷

Technician Profiles

Complete profiles with contact details, skills, certifications, and employment information. Track hire dates, hourly rates, and assigned vehicles. Everything in one place.

🎓

Training & Certifications

Track technician certifications, qualifications, evidence, required credentials and renewal work. Compliance matrix views show valid, expiring, expired, missing and optional credentials.

⏱️

Timesheet Tracking

Visual Gantt chart timesheets showing travel, onsite, and return segments. See the full day at a glance. Technicians log time from the mobile app, managers review and approve.

📍

GPS Timesheet Audit

Validate timesheets against actual GPS locations. Flag discrepancies for review. Provides audit evidence and eliminates timesheet disputes. Optional setting for trust-but-verify management.

💵

Payroll Export

Export approved timesheets in formats compatible with major payroll providers. Automatic overtime calculation based on your rules. Time-off pay and absence deductions included.

💻

Technician Web Portal

Give technicians browser access as well as the mobile app. They can view assigned jobs, planner, maps, documents, quotes, tools, timesheets, memos, messages, and HR information where enabled.

Timesheet Gantt chart showing travel, onsite and return segments with GPS audit verification

Timesheet Tracking — Gantt chart with travel, onsite, and return segments plus GPS audit

HR & Workforce

Workforce management built into your field service platform. Staff profiles, 80+ granular permissions, org charts, time-off requests, training records and development plans — so you run people operations from the same system you run jobs.

👤

Staff Profiles

Employee profiles with personal information, emergency contacts, employment history, and HR documents. Upload contracts, agreements, and certifications. Complete personnel records.

🔐

Granular Permissions

80+ permission settings to control exactly what each user can see and do. Create roles for dispatchers, managers, technicians, and administrators. Master user bypass for owners.

🏢

Organization Chart

Visual org chart showing company hierarchy. Define reporting lines, team structures, and approval chains. Interactive chart for growing businesses managing multiple teams.

🏖️

Time-Off Management

Self-service vacation and time-off requests. Employees submit requests via app or web, managers approve with one click. Automatic calendar blocking prevents scheduling conflicts.

📚

Training Records & Development Plans

Manage training completions, certification evidence, renewal reminders, evidence review and technician development targets in the same workforce system.

🧩

Staff Portal

Give office staff, helpers, and non-technician workers a focused portal for time off, timesheets, documents, memos, messages, assigned vehicles, and read-only planner visibility where permissions allow.

📋

Compliance Matrix

See which technicians hold required certifications, what is expiring, what is missing, and where the business has compliance gaps. Export matrix views for audits and renewals.

🗂️

HR Cases & Performance Reviews

Manage HR cases, staff records, development plans, and performance review workflows inside the same system used for field operations and training evidence.

Fleet & Vehicles

Fleet management tools for service contractors. Vehicle registry, customizable daily inspection checklists completed in-app with photo evidence, service reminders, and state inspection tracking.

Inventory Management

Accounting Integrations

Connect field service jobs, work orders, invoices, customers, tax codes and accounting handoff workflows with finance tools where configured. Reduce double entry between your field operations and your accounting system.

Reports & Dashboards

Operational visibility without spreadsheet gymnastics. Customizable reports, AI-generated reports from plain-English questions, live dashboards with 50+ tile types, and financial analytics — so you spot problems before they become expensive.

📊

Custom Reports

Build reports on jobs, invoices, technicians, customers, and equipment. Filter by date range, status, customer, and more. Export to PDF or Excel.

🤖

AI Report Builder

Ask questions in plain English and get formatted reports. "Show me revenue by customer this quarter" generates a professional report instantly. No report training needed.

📈

Real-Time Dashboards

Live dashboards with 50+ tile types. Job counts, revenue tracking, technician utilization, invoice aging, and more. Drag-and-drop layout with role-based views.

💰

Financial Analytics

Monthly cashflow dashboard showing money in vs money out. Revenue trends, expense tracking, and profitability analysis. 12-month rolling view of your financial health.

📅

Scheduled Reports

Create saved reports and send regular exports to the right people. Customer-visible reports can also be published through the portal for account reviews and service transparency.

Documents & Communication

Store documents, send emails, and generate branded PDFs — all from inside the platform. Quote PDFs, job sheets, invoices, and statements use drag-and-drop template builders with merge tags, so they look professional without design work.

📁

Document Library

Cloud storage for manuals, certificates, policies, photos, and compliance documents. Assign documents to technicians for acknowledgment. Everything organized and accessible from anywhere.

📧

Email System

Send quotes, invoices, job confirmations, and statements directly from the platform. Email templates with merge tags for personalization. Email open and click tracking.

✉️

Microsoft 365 Email Integration

Connect Microsoft 365 for authenticated outbound email workflows. Quotes, invoices, statements, and job messages can be sent through your configured provider with tenant-specific templates.

📄

PDF Templates

Design professional PDFs for jobs, quotes, invoices, statements, and purchase orders. Drag-and-drop template builder with merge tags. Multiple templates per document type.

📢

Staff Memos

Broadcast announcements to your team. Create memos that require acknowledgment. Track who has read important communications. Perfect for policy updates and safety alerts.

Subcontractors & Projects

Tools for businesses that outsource work or manage multi-phase projects. Issue work orders to subcontractors through a secure portal, track acceptance and completion, and group related jobs into projects for larger scopes of work.

🤝

Subcontractor Portal

Connect with subcontractor companies securely. Send work orders from jobs, track real-time status from acceptance through completion. Both parties maintain operational independence.

📋

Work Order Issuance

Create work orders from jobs and send to subcontractors. Include equipment details, scope of work, and pricing. Track acceptance and completion status.

📁

Project Grouping

Group related jobs into projects for larger work scopes. Track project progress, costs, and timelines. Perfect for construction, renovation, and multi-phase work.

Platform & Security

Two-factor authentication, 80+ granular permissions, bulk CSV import, and recycle bins that protect against accidental deletions. Your data stays safe, your team gets appropriate access, and migrating from another system takes minutes.

🔐

Two-Factor Authentication

Secure your account with two-factor authentication. Authenticator app support for admin, technician, and customer logins. Optional enforcement per user type.

👤

User Permissions

80+ granular permission settings control exactly what each user can see and do. Create custom roles or assign permissions individually. Master bypass for owners.

📤

Bulk CSV Import

Mass import customers, sites, equipment, and jobs from CSV files. Template downloads ensure correct formatting. Validation checks catch errors before import. Migrate from spreadsheets in minutes.

🗑️

Recycle Bins

Deleted records go to recycle bins for 90 days. One-click restore with full audit trail. Protects against accidental deletions. Available for jobs, quotes, invoices, customers, and more.

Industry Solutions

The same field service management platform adapts to 30+ trades. Custom statuses, job types, compliance checklists, and PDF templates mean your HVAC operation looks different from an electrical contractor's setup — but both run on the same system.

Explore industry-specific pages to see how Field Ascend handles the workflows, terminology, and compliance requirements for your trade.

Home Service Software HVAC Software Plumbing Software Software for electrical contractors Elevator Service Software CMMS / CAFM Facility Management Landscaping Lawn Care Heating Contractor Drain Cleaning Generator & UPS Fire Protection Pest Control Pool Service Solar Installation Roofing field service software Appliance Repair Commercial Cleaning Construction Telecom & Cable

View all industries we serve →

Frequently Asked Questions

What is field service management software?

Field service management software is a platform that helps service businesses schedule jobs, dispatch technicians, track work orders, and manage the end-to-end workflow from customer request through to invoicing. Good FSM software replaces spreadsheets, whiteboards, and disconnected apps with a single system that connects the office, the field, and the customer.

How much does field service software cost?

Field Ascend starts at £10 per user per month (approximately ~$13 USD at current exchange rates). That includes the full platform — scheduling, work orders, mobile app, invoicing, reports, and integrations. There are no setup fees and no contracts. You can start with a free trial and scale up as your team grows. See the pricing page for live USD pricing.

What makes the best FSM software?

The best field service management software handles the full job lifecycle — not just scheduling or just invoicing, but the connected flow between them. Look for work order management that ties directly into invoicing, a mobile app that works offline, and integrations with your accounting system. For a broader platform view, see the field service software overview, or read the field service software buyer guide.

Is Field Ascend a cloud-based field service platform?

Yes. Field Ascend is fully cloud-based — nothing to install, no servers to manage. Your team accesses it from any web browser, and the mobile app works on iOS and Android. Data syncs in real-time across all devices. The mobile app also works offline, storing data locally and syncing when connection returns.

Does Field Ascend work as a field service management app?

Yes. The Field Ascend mobile app is a native iOS and Android application built specifically for field technicians. It covers the full job workflow: dashboard visibility, planner views, map-based working, mobile quote access, messaging, travel tracking, on-site work logging, photos, signatures, materials, compliance checklists, and timesheets. It works offline in basements, tunnels, and rural areas where other apps fail.

Does Field Ascend have AI features?

Yes — and they do practical work, not just summaries. AI generates quotes from uploaded customer requests using your pricing history. AI builds dashboards and reports from plain-English questions. AI analyzes purchase orders, matches line items to existing quotes, and creates jobs automatically. These tools save real hours every week for dispatchers, estimators, and managers.

See the Full Platform for Yourself

80+ features, one field service management platform, from ~$13/user/month. Start a free trial — No long-term commitment. Set up takes minutes, not days.

Start Your Free Trial